![]() ![]() This will make disposal much easier and will keep the work site safe when compared to simply throwing the debris on the ground below. Pile the roofing debris in a dumpster, trailer, or truck bed. From there, pull up on the shingles to remove them sheet-by-sheet. Start at the peak of the roof, using a garden fork, pry bar, or claw hammer to remove the ridge cap. Lay tarps and plywood sheets down to catch all the roofing debris. Most of these materials will be recyclable or reusable, so set them aside: Next, remove any wallboard as needed to pull out wiring and pipes in the walls. If there is a sub-panel in the garage, you'll be able to turn off the breaker for it in the main panel.ĭisconnect and cap off branch lines for gas and water, including water lines that feed any hose bibbs on the outside of the garage. With proper permit(s) in hand, the next steps are to turn off the gas, water, and electricity (if applicable). If you are required to get a permit, you will likely need to pay a fee, averaging $100-$200. Some areas will require you to get a permit to do the work, but some cities do not. ![]() The first step in demolition is to get whatever permits your local building department requires for a garage demolition. Get permits from your local building department. Jump to:įind garage demolition and removal near you Learn the garage demolition process, who to hire to assist with garage demolition, and more. If you have an old or unwanted garage sitting on your property, garage demolition is a great solution. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |